Thursday, June 30, 2011

Systems Engineering, Product/System/Service Implementing, and Program Management

A Pattern for Development and Transformation Efforts
Recently a discussion started in a LinkedIn Group that recruiters, HR, and Management was using the term "Systems Engineer" indiscriminately.   The conclusion was that the discipline of Systems Engineering and the role of the Systems Engineer in Development and Transformation Efforts is poorly understood by most people, and perhaps by many claiming to be Systems Engineers.  In my experience of building a Systems Engineer group from 5 to 55, I can attest to this conclusion.

Currently, I am working on a second book, with the working title of "Systems Engineering, System Architecture, and Enterprise Architecture".  In the book, I'm attempting to distill 45+ years of experience and observation of many efforts, from minor report revisions to the Lunar Module, F-14, B-2, and X-29 aircraft creation efforts, to statewide IT outsourcing efforts.  This post contains excerpts of several concepts from this manuscript.

The Archetypal Pattern for Product/System/Service Development and Transformation
At a high level there is an architectural process pattern for Product/System/Service development and transformation.  I discuss this pattern in my current book, Organizational Economics: The Formation of Wealth, and it is one key pattern for my next book.  This pattern is shown in Figure 1.
Figure 1--The Three Legged Stool Pattern

As shown in Figure 1, the architectural process model posits that all development and transformation efforts are based on the interactions of three functions (or sub-processes), Systems Engineering, Design and Implementation, and Program Management.  This is true whether a homeowner is replacing a kitchen faucet or NASA is building a new spacecraft.  Each of these sub-processes is a role with a given set of skills.

Consequently, as shown in Figure 1, I call this process pattern "The Three-legged Stool" pattern for development and transformation.  I will discuss each sub-process as a role with requirements.  Therefore, this is what I see as the needs or requirements for the process and the skills for the role.  In my next book, I will discuss more about how these can be done.

As shown in Figure 1, the program management role is to enable and support the other two roles with financial resources and expect results, in the form of a product/system/service meeting the customer's requirements.

Systems Engineering (and System Architecture) Role
The first role is the Systems Engineer/System Architect.  This role works with the customer to determine the requirements--"what is needed."  I've discussed this role in several posts including Enterprise Architecture and System Architecture and The Definition of the Disciplines of Systems Engineering.  Three key functions of this sub-process are:
These are the key responsibilities for the role, though from the posts, cited above, "The devil (and complexity of these) is in the detail".

The key issue with the Systems Engineering/System Architect role within a project/program/effort is that the requirements analysis procedure becomes analysis paralysis.  That is, the Systems Engineer (at least within the "waterfall" style effort, that assumes that all of the requirements are known upfront) will spend an inordinate amount of time "requirements gathering"; holding the effort up, to attempt to insure that all of the requirements are "know"--which is patently impossible.

 I will discuss solutions to this issue in the last two sections of this post.

Design and Implementation Role
When compared with Systems Engineering, the Design and Implementation functions, procedures, methods, and role are very well understood, taught, trained, and supported with tooling.  This role determines "How to meet the customer's needs", as expressed in the "What is needed (requirements)", as shown in Figure 1.  These are the product/system/service designer, developers, and implementers of the transformation; the Subject Matter Experts (SMEs) that actually create and implement.  These skills are taught in Community Colleges, Colleges, Universities, Trade Schools, and on-line classes.  The key sub-processes, procedures, functions, and methods are as varied as the departments in the various institutions of higher learning just mentioned.

There is a significant issue with designers and implementers, they attempt to create the "best" product ever and go into a never ending set of design cycles.  Like the Systems Engineering "analysis paralysis", this burns budget and time without producing a deliverable for the customer.  One part of this problem is that the SMEs too often forget is that they are developing or transforming against as set of requirements (The "What's Needed").  In the hundreds of small, medium, and large efforts in which I've been involved, I would say that the overwhelming percentage of time, the SMEs never read the customer's requirements because they understand the process, procedure, function, or method far better than the customer.  Therefore, they implement a product/system/service that does not do what the customer wants, but does do many functions that the customer does not want.  Then the defect management process takes over to rectify these two; which blows the budget and schedule entirely, while making the customer unhappy, to say the least. The second part of this problem is that each SME role is convinced that their role is key to the effort.  Consequently, they develop their portion to maximize its internal efficiency while completely neglecting the effectiveness of the product/system/service.  While I may be overstating this part somewhat, at least half the time, I've seen efforts where, security for example, attempts to create the equivalent of "write only memory"; the data on it can never be used because the memory cannot be read from.  This too, burns budget and schedule while adding no value.

Again, I will discuss solutions to this issue in the last two sections of this post.

Program Management Role
As shown in Figure 1, the role, procedures, and methods of Program Management is to support and facilitate Systems Engineering and Design and Implementation roles.   This is called Leadership.   An excellent definition of leadership is attributed to Lao Tzu, the Chinese philosopher of approximately 2500 years ago.  As I quoted in my book, Organizational Economics: The Formation of Wealth:
  • "The best of all leaders is the one who helps people so that, eventually, they don’t need him.
  • Then comes the one they love and admire.
  • Then comes the one they fear.
  • The worst is the one who lets people push him around.
Where there is no trust, people will act in bad faith.  The best leader doesn’t say much, but what he says carries weight.  When he is finished with his work, the people say, “It happened naturally"."[1]
[1] Lao Tzu, This quote is attributed to Lao Tzu, but no source of the quote has been discovered.
If the program manager does his or her job correctly, they should never be visible to the customer or suppliers; instead they should be the conductor and coordinator of resources for the effort.  Too often the project and program managers forget that this is their role and what the best type of leader is. Instead, they consider themselves as the only person responsible for the success of the effort and "in control" of the effort.  The method for this control is to manage the customer's programmatic requirements (the financial resources and schedule).  This is the the way it works today.

The Way This Works Today: The Program Management Control Pattern
There are two ways to resolve the "requirements analysis paralysis" and the "design the best" issues, either by the Program Manager resolving it, or through the use of a process that is designed to move the effort around these two landmines.

The first way is to give control of the effort to manager.  This is the "traditional" approach and the way most organization's run development and transformation efforts .  The effort's manager manages the customer's programmatic requirements, (budget and schedule), so the manager plans out the effort including its schedule.  This project plan is based on "the requirements", most often plan includes "requirements analysis".

[Rant 1, sorry about this: My question has always been, "How is it possible to plan a project based on requirements when the first task is to analyze the requirements to determine the real requirements?"  AND, I have seen major efforts (hundreds of millions to billions) which had no real requirements identified...Huh?]

The Program or Project Manager tells the Systems Engineer and Developer/Implementer when each task is complete; because that's when the time and or money for that task on the schedule is done, regardless of the quality of the work products from the task.  "Good" managers keep a "management reserve" in case things don't go as planned.  Often, if nothing is going as planned, the manager's knee jerk reaction is to "replan"; which means creating an inch-stone schedule.  I've seen and been involved in large efforts where the next level of detail would be to schedule "bathroom breaks".  This method for resolution of "analysis paralysis" and "design the best" will almost inevitably cause cost and schedule overruns, unhappy customers, and defective products because the effort's control function to control costs and schedules.

The Program Management Control Pattern
Figure 2 shows the Program Management Control Pattern.  The size of the elipse shows the percieved importance of each of the three roles.



Figure 2--The Program Management Control Pattern


First, the entire "Three Legged Stool" Pattern is turned upside down is the Program Management Control Pattern.  Rather than the Program Manager enabling and supporting the development process by understanding and supporting the development or transformation process, the Program Manager "controls" the process.  In Lao Tzu leadership taxonomy, this process pattern makes the Program Manager one of the latter increasingly ineffective types.  It also reverses importance of who produces the value in the effort.

To be able to "Control" the effort, the Program Manager requires many intermediate artifacts, schedules, budgets, and status reports, which use up the resources of the efforts and  are non-valued work products, the customer might look at these artifacts once during a PMR, PDR, CDR, or other "XDR" (Rant 2: Calling these review Program Management Reviews, instead of some type of Design Review", Preliminary, Critical, etc., demonstrates the overwhelming perceived importance of the programmatic requirements by Program Managers.)  I submit that all of these intermediate artifacts are non-value added because 3 months after the effort is completed, the customer or anyone else will not look at any of them except if the customer is suing the the development or transformation organization over the poor quality of the product.  All of these management reviews require resources from the Developers/Implementers and the Systems Engineers.

One extreme example of this management review procedure was the procedures used in development of new aircraft for the US Air Force and Navy during the 1980s and 90s--sometimes facts are stranger than fantasy.  The DoD required some type of "Development Review" every 3 months.  Typically, these were week-long reviews with a large customer team descending on the aircraft's Prime Contractor.  Program Management (perhaps, rightly) considered these of ultimate importance to keeping the contract and therefore wanted everyone ready.  Consequently, all hands on the effort stopped work 2 weeks prior to work on status reports and presentation rehearsals.  Then, after the "review" all hands would spend most of an additional week reviewing the customer's feedback and trying to replan the effort to resolve issues and reduce risk.  If you add this up, the team was spending 1 month in every 3 on status reporting.  And I have been part of information technology efforts, in this day of instant access to everything on a project where essentially the same thing is happening.  Think about it, these aircraft programs spent one third of their budget, and lengthened the programs by 1/3 just for status for what?  Intermediate artifacts of no persistent value--Who looked at the presentations of the first Preliminary Design Review after the aircraft was put into operations?  [Rant 3: Did the American citizen get value for the investment or was this just another Program Management Entitlement Program funded by the DoD?]

Second, as shown in Figure 2, the Systems Engineering role is substantially reduced  in the perception of the Program Manager.  An example of this was brought home to me on a multi-billion program, when I asked the chief engineer where the requirements were stored, he quoted the Program's Director as saying, "We don't need no damn requirements, we're too busy doing the work."  This Director underlined this thinking; he kept hiring more program management, schedule planners, earned value analysts, and so on, while continuous reducing then eliminating the entire Systems Engineering team and leaving only a few System Architects.  He justified this by the need to increased control and cost reduction to meet his budget [Rant 4: and therefore to get his "management bonus"--no one ever heard of the Design or a System Engineering Bonus].  Actually, I've seen this strategy put into play on large (more than $20M) three programs with which I was associated and I've heard about it on several more within the organization I was work for and in other organizations, over the past 10 years.  

Another program that I worked on as the Lead Systems Engineer that had the same perception of the Systems Engineer (including the System Architect's role within the Systems Engineering discipline/role).  It is an extreme example of all that can go wrong because of lack of Systems Engineering.  This effort was development of a portal capability for the organization.  It started with a that had 10 management personnel and myself.  They articulated a series of ill-thought-out capability statements, continued by defining a series products that had to be used (with no not identification of Customer System or IT Functional requirements), with a 6 weeks schedule, and ended with a  budget that was 50 percent of what even the most optimistic budgeteers could "guessitmate".  They (the three or four levels of management represented at the meeting) charged me with the equivalent of "Making bricks without straw or mud in the dark", that is, creating the portal.  Otherwise, my chances of getting on the Reduction In Force (RIF) list would be drastically increased.

Given that charge, I immediately contacted the software supplier and the development team members from two successful efforts within the organization to determine if there was any hope of the effort within the programmatic constraints to accomplish the task.  All three agreed, it could not be done in less than 6 months.  Faced with this overwhelming and documented evidence, they asked me what can be done.  The result was based on their "capability" statements, and "Requirements (?)" documents from the other two projects, I was able to cobble together a System Architecture Document (SAD) that these managers could point to as visible progress.  Additionally, I used a home grown risk tool to document risks as I bumped into them.  Additionally, I instituted a risk watch list report on a weekly basis, which all the managers ignored.

At this point one fiscal year ended and with the new year, I was able to have the whole, nationwide, team get together, in part, to get everyones requirements and design constraints.  Additionally, I presented an implementation plan for the capabilities I understood they needed.  This plan included segmenting the functions for an IOC build in May, followed by several additional several additional builds.  Since this management team was used to the waterfall development process, the rejected this with no consideration; they wanted it all by May 15th.  In turn, I gave them a plan for producing, more or less, an acceptable number of functions, and an associated risk report with a large number of high probability/catastrophic impact risks.  They accepted the plan.  The plan failed; here is an example of why.

One of the risks was getting the hardware for the staging and production systems in by March 15th.  I submitted the Bill of Materials (BOM) to the PM the first week in February.  The suppliers of the hardware that I recommended indicated that the hardware would be shipped within 7 days of the time the order was received.  When I handed the BOM to the PM, I also indicated the risk if we didn't get the systems by March 15th.  On March 1st, I told him that we would have a day for day slippage in the schedule for every day we didn't receive the hardware.  The long and the short of it was that I was called on the carpet for a wire brushing on July 28th when we had the program held up because of lack of hardware.  Since I could show the high-level manager that, in fact, I had reported the risk (then issue) week after week in the risk report she received, her ire finally turned on the PM, who felt he had the responsibility.

The net result of these and several other risks induced either by lack of requirements or lack of paying attention to risks resulted in a system that was ready for staging the following December.  Management took it upon themselves to roll the portal into production without the verification and validation testing.  The final result was a total failure of the effort due to management issues coming from near the top of the management pyramid.  Again, this was due to a complete lack of understanding of the role of Systems Engineering and Architecture.  In fact, this is a minor sample of the errors and issues--maybe I will write a post on this entire effort as an example of what not to do.

In fact the DoD has acknowledged the pattern shown in Figure 2 and countered it by creating System Engineering Technical Advisory (SETA) contracts.

The Utility of Program Management
[Rant 5: Here's where I become a Heritic to many, for my out of the warehouse thinking.]  In the extreme, or so it may seem it is possible that projects don't need a project manager.  I don't consider that a rant because it is a fact.  Here are two questions that makes the point.  "Can an excellent PM with a team of poorly skilled Subject Matter Experts (SMEs) create a top notch product?" and  "Can a poor PM with a team of excellent SMEs create a top notch product?"  The answer to the first is "Only with an exceptional amount of luck", while the answer to the second is "Yes! Unless the PM creates too much inter-team friction."  In other words, except for reducing inter-team friction, which uses resources unproductively, and for guiding and facilitating the use of resources, the PM produces no value, in fact, the PM creates no value, just reduces friction, which preserves value and potential value.

None of the latter three types of leaders, as described by Lao Tzu, can perform perform this service to the team, the ones I call in my book, the Charismatic, the Dictator, or the Incompetent. In other words, the PM can't say and act as if "The floggings will continue until morale improves".

Instead, the PM must be a leader of the first type as described by Lao Tzu and as I called in my book as "the coach or conductor".  And any team member can be that leader.  As a Lead Developer and as a Systems Engineer, I've run medium sized projects without a program manager and been highly successful--success in this case being measured by bringing the effort in under cost, ahead of schedule, while meeting or exceeding the customers requirements  Yet, on those none of the programs, for which I was the lead systems engineer and which had a program manager and who's mission was to bring in the effort on time and within budget, was successful.  On the other hand, I've been on two programs where the PM listened with his/her ears rather than his/her month and both paid attention to the System Requirements; those efforts were highly successful.

The net of this is that a coaching/conducting PM can make a good team better, but cannot make a bad team good, while a PM in creating better projects plans, producing better and more frequent status reports, and creating and managing to more detailed schedules will always burn budget and push the schedule to the right.

A Short Cycle Process: The Way It Could and Should Work
As noted near the start of this post, there are two ways to resolve the "requirements analysis paralysis" and the "design the best" issues, either by Program Management Control, or through the use of a process that is designed to move the effort around these two landmines.

This second solution uses a development or transformation process that assumes that "Not all requirements are known upfront".  This single change of assumption makes all the difference.  The development and transformation process must, by necessity, take this assumption into account (see my post The Generalize Agile Development and Implementation Process for Software and Hardware for an outline of such a process).  This takes the pressure off the customer and Systems Engineer to determine all of the requirements upfront and the Developer/Implementer to "design the best" product initially.  That is, since not all of the requirements are assumed to be known upfront, the Systems Engineer can document and have the customer sign off on an initial set of known requirements early in the process (within the first couple of weeks), with the expectation that more requirements will be identified by the customer during the process.  The Developer/Implementer can start to design and implement the new product/system/service based on these requirements with the understanding that as the customer and Systems Engineer identify and prioritize more the of the customer's real system requirements.  Therefore, they don't have to worry about designing the "best" the first time; simply because they realize that without all the requirements, they can't.
 
Changing this single assumption has additional consequences for Program Management.  First, there is really no way to plan and schedule the effort; the assumption that not all the requirements are known upfront means that if a PM attempts to "plan and schedule" the effort is an "exercise in futility."  What I mean by that is if the requirements change at the end/start of the new cycle, then the value of a schedule of more than the length of one cycle is zero because at the end of the cycle the plan and schedule, by definition of the process, change.  With the RAD process I created, this was the most culturally difficult issue I faced with getting PM and management to understand and accept.  In fact, a year after I moved to a new position, the process team imposed a schedule on the process.

Second, the assumptions forces the programmatic effort into a Level Of Effort (LOE) type of budgeting and scheduling procedure.  Since there is no way to know what requirements are going to be the customer's highest priority in succeeding cycles, the Program Manager, together with the team must assess the LOE to meet each of the requirements from the highest priority down.  They would do this by assessing the complexity of the requirement and the level of risk with creating the solution that meets the requirement.  As soon as the team runs out of resources forecast for that cycle, they have reached the cutoff point for that cycle.  They would present the set to the customer for the customer's concurrence.  Once they have customer sign off, they would start the cycle.  Sometimes a single Use Case-based requirement with its design constraints will require more resources than are available to the team during one cycle.  In that case, the team, not the PM, must refactor the requirement. 

For example, suppose there is a mathematically complex transaction, within a knowledge-based management system, which requires an additional level of access control, new hardware, new COTS software, new networking capablities, new inputs and input feeds, new graphics and displays, and transformed reporting.  This is definitely sufficiently complex that no matter how many high quality designers, developers, and implementers you up on the effort, it cannot be completed within one to perhaps even three months (This is  the "9 women can't make a baby in a month" principle).  Then the team must refactor (divide up) the requirement into chunks that are doable by the team within the cycle's period, say one to three months.  For example, the first cycle might define and delimit the hardware required and develop the new level of access control; and so on for the number of cycles needed to meet the requirement.

Third, with this assumption of "not having all the requirements", the PM must pay most attention to the requirements, their verification and validation, and to risk reduction.  All of these functions lay within the responsibility of the Systems Engineer; but the PM must pay attention to them to help best allocate the budget and time resources.

Fourth, there is no real need for PMRs, status reports, or Earned Value metrics.  The reason is simple, high customer involvement.  The customer must review the progress of the effort every month at a minimum, generally every week.  This review is given by the developers demonstrating the functions of the product, system, or service on which they are working.  And if the customer is always reviewing the actual development work, why is there a need for status, especially for an LOE effort?

Fifth, rolling a new system or service has significant implications for the customer.for the timing and size of the ROI for the development or transformation effort.  With an IOC product, system, or service, the customer can start to use it and in using the IOC will be able to, at a minimum, identify missing requirements.  In some cases, much more.  For example, in one effort, in which I performed the systems engineering role, during the first cycle the team created the access control system and the data input functions for a transactional website.  During the second cycle, the customer inserted data into the data store for the system.  While doing this, the customer discovered sufficient errors in the data to pay for the effort.  Consequently, they were delighted with the system and were able to fund additional functionality, further improving their productivity.  If the effort had been based on the waterfall, the customer would have had to wait until the entire effort was complete, may not have been as satisfied with the final product (more design defects because of unknown requirements), would not have discovered the errors, and therefore, would not have funded an extension to the effort.  So it turned out for a win for the customer-- more functionality and greater productivity--and for the supply--more work.

In using a short cycle process based on assuming "unknown requirements", there will always be unfulfilled customer system requirements at the end of this type of development or transformation process.  This is OK.  It's OK for the customer because the development or transformation team spent the available budgetary and time requirements in creating a product, system, or service that meets the customer's highest priority requirements, even if those requirements were not initially identified; that is, the customer "got the biggest bang for the buck".  It's OK for the team because a delighted customer tends to work hard at getting funding for the additional system requirements.  When such a process is used in a highly disciplined manner, the customer invariably comes up with additional funding.  This has been my experience on over 50 projects with which I was associated, and many others that were reported to me as Lead Systems Engineer for a Large IT organization.

Conclusions and Opinions
The following are my conclusions on this topic:
  1. If a development or transformation effort focuses on meeting the customer's system requirements, the effort has a much better chance of success than if the focus is on meeting the programmatic requirements.
  2. If the single fundamental assumption is changed from "All the requirements are known up front" to "Not all the requirements are known up front" the effort has the opportunity to be successful or much more successful by the only metric that counts, the customer is getting more of what he or she wants, and that increases customer satisfaction.
  3. If the development or transformation effort can roll out small increments will increase the customer's ROI for the product, system, or service.
  4. Having a Program Manager, who's only independent responsibility is managing resources be accountable for an effort is like having the CEO of an organization report to the CFO; you get cost efficient, but not effective products, systems, or services.  [Final Rant: I know good PMs have value, but if a team works, that is because the PM is a leader of the first type: a coach and conductor.] Having a Program Manager that understands the "three legged stool" pattern for development or transformation, and who executes to it will greatly enhance the chance for success of the effort.

Saturday, May 28, 2011

Why Separate Design Constraints from the Customer's System Requirements?

Background
Traditionally,  Requirements Identification, Analysis, and Management was based on "Shall" statements, that is, "the product (service) shall...".  Fundamentally, the "Shall Statements" were contractual obligations to be met by the contractor in creating a new product.  Systems Engineers and Requirements Analysts would attempt to identify both the requirements' description and metrics for each (i.e., when the requirement was met) by starting the Requirements Identification and Management effort by "shredding" the contract to identify the requirements within "the shall" statements.

Once the contractually contracted "requirements" were identified, the Systems Engineer/System Architect would decompose those requirements, partially in an effort to:

1) identify any requirements gaps,
2) ensure that all requirements were single requirements and not a group of requirements, and
3)  identify evaluation procedures to ensure that the requirements were met. 

This last reason was a requirement of any Systems Engineering process because most of the contractual requirements had no method for identifying when they were met; they were statements of the capabilities the customer required.  For example, within Information Technology (IT) "the system shall be user friendly" is typical.  However, what the customer meant by "user friendly" was left to the imagination of the software developer.  This particular requirement has led to many "programmer friendly" systems being initially rolled out, a great many cost overruns to "fix the defects" (defects in the requirements), and a great deal of customer dissatisfaction.

With respect to the first two reasons for decomposition, I have seen both the contracts and the requirements stripped from the contracts of several historic aerospace programs and poor the resulting requirements were.  The consequence was that Systems Engineers, from the 1960s to the 1990s, spent a great deal of effort and time to decompose the requirements in an attempt to truly identify the real requirements (those that the customer wants, is willing to pay for, and with a definable and quantifiable measurement of when it is met. 

Ralph Young, in his book Effective Requirements Practices from 2001, discussed studies that found that less than 50% of the real requirements for a system were in the contractual agreement.  Further there were significant numbers of the known requirements that were either conflicting or simply wrong.  Since this has been the case for most efforts most of the time, you can understand why requirements decomposition (definition) became such an important function of the Systems Engineer.  The decomposition process included State Diagrams, Functional Flow Diagrams and many other "requirements analysis" techniques that enable the Systems Engineer (Requirements Analyst) to tease out as many "missing" requirements as possible. 

____________
The Program Management Issue with Requirements (A Sidebar)
Once completed (though many times before completion) the Program Managers and Finance Engineers put a project plan together based on the Heroic Assumption that all of the customer's requirements are known.  That is the foundational assumption of the Waterfall process for System Realization; and is patently false.  Consequently, project after program after effort fails to meet the programmatic requirements unless the Program Manager simply declares victory and leaves the mess for the operational Systems Engineers and Designers/Developers to clean up.  Generally, they do this through abbreviated validation or no validation at all.

The reason they make the assumption that "all the requirements are known upfront" is that it is the only way they can see to create a project schedule, project plan, and earned value metrics to control the effort.  Therefore, they religiously believe that their assumption is true, when time after time its proven false.  Einstein's definition of insanity is "perform the same test over and over and expecting different results".

Making the assumption that "not all of the requirements are known upfront" makes life much more difficult for the Program Manager, unless the process and functions is designed around that assumption.  While this has been done, I for one have done it, it is heretical to the Program Management catholic doctrine.  Until Program Management and Financial Engineering "disciplines" learn to put more emphasis on the Customer's System or Product requirements and less on cost and schedule, and understand that the known requirements are merely an incomplete and partially incorrect set of requirements, development and transformation programs will always miss their cost and schedule marks; in addition to having very dissatisfied customers.
(End of Sidebar)

From the mid-1960s to ~2000, I dealt with issue of requirements identification, trying most of the methods described in Ralph Young's book cited above.  The net result was that all requirements identification methods failed for one of four reasons.
  1. The Systems Engineer didn't describe the requirements using the customers language and ideas and the Systems Engineer didn't rephrase or translate them into the language of the developers.  This leads to many defects, finger pointing exercises, and customer dissatisfaction.
  2. The second is described in the sidebar.  That is, the waterfall process used in most development and transformation efforts was founded on an assumption that is just plain wrong.
  3. For the types of efforts I was working on, IT transformation projects, the customer's system requirements were only partially based on the process(es) that they were supposed to support.  Most of the time they were short-sightedly based on the function that the particular customer was performing.  Consequently, "optimizing the functions, sub-optimized the process".
  4. All customer system requirements were treated the same.  I found this to be incorrect and would lead to many defects.
Types of Requirements: Capabilities, Functional Requirements, and Design Constraints
When I started analyzing the requirements in various requirements documents and systems in the early 1990s, I found that there were two classes of requirements, and then requirements that weren't requirements at all, just wishful thinking.  The two classes are those that the system "must perform" (or process functions it must enable and support) and those the system "must meet".  An example of a must perform requirement is "The system will show project status using a standard form".  The standard form would be considered as a must meet requirement because a form is nothing that a system "must perform", but it is a requirement that the system "must meet".  This requirement constrains the design.  The designer/developer can't create a new form; he or she must create a system the produces the standard form.  Therefore, I define it as a Design Constraint, since it constrains the design.  Likewise, a requirement that the system "must perform" shows action.  Therefore, I define this type of requirement as a customer system functional requirement, or more simple a Customer System Requirement.  Finally, there are these "wishful thinking" statements.  Many times, these are, in fact, genuine customer needed capabilities, (unknown requirements).  The reason they are not requirements is that they have no metric associated with them to enable the implementer to know when they have been met.  Therefore, rather than ignore them, I've put them into a category (or type) I call Capabilities.  These are statements the Systems Engineer must investigate to determine if they are requirements or not.

In any software development or transformation effort, frequently, there are more design constraints than customer system requirements because there are so many types of design constraints and the relative number of functions is, normally, limited.  Typically, an organization does not radically reorganize or transform all of its processes and supporting systems concurrently; if there is a higher risk method to move to the going out of business curve, other than fraud, I don't know it.  Instead, the organization will develop or transform a single business function or service in a single project; though it may have several projects.

On the other hand, all development and transformation efforts of an organization are subject to the policies and standards of the organization, to contractual obligation of the organization, and to external laws and regulations.  All of these constrain the design of systems.  For example, Section 508 of the US Rehabilitation Act effects the development of all governmental websites by ensuring that the visually and auditorially impaired can use the site.  Again, the Clinger-Cohn Act effects both the choice of transformation efforts and the products IT can use within those projects, by not allowing software, which has been sunsetted or is being sunsetted, to be used in the operation of many businesses within the United States.  This act mandates that those systems must be updated to a current version of the system.  Obviously, these constrain the design of a new or a transforming system or service of an organization, irrespective of the function the system or service of the organization.

The organization has other design constraints, like having the organization's logo on all user interface displays, for example, or producing the same formats for the reports coming out of the new system, as from the prior system.  The organization may use Microsoft databases and therefore have expertise supporting them; in which case using Oracle or IBM products would not be feasible--except in very special circumstances (e.g., a contractual obligation).  Consequently, these "must meet" requirements are pervasive across all of an organization's development and transformation efforts.
Advantages of Separation
When, in the 1990s, I discovered this, I recommended to my management that we start a repository of design constraints to use on all projects of our aerospace and defense corporate organization and have recommended it many time since.   In my presentation I envisioned four benefits:
  • It enables and supports the reuse of Design Constraints and their evaluation methods.  This makes evaluating them both consistent and cost efficient.
  • It minimizes the risk of leaving a Design Constraint out of the requirements since the Systems Engineer has a long list of these from the repository.  This is a much better way than either trusting the Systems Engineer to remember or figure it out, or any private lists of design constraints kept by any single Systems Engineer.
  • If the Customer System Requirements are separated from the Design Constraints, then the System Architecture process is more effective and cost efficient because the System Architect does not have to attempt to sort these out and keep them straight during the process.  (Note: the Customer System Requirements are the requirements that are decomposed and from which the System Architecture is derived.)
  • Finally, if the organization uses an Enterprise Architecture process like I have described in I discussed in my posts A Model of an Organization's Control Function using IDEF0 Model, The OODA Loop, and Enterprise Architecture and Asset and Enterprise Architecture Repository then, understanding of what Systems will be affected with a change in policies or standards becomes a simple effort.

Wednesday, May 4, 2011

SOA, the User Interface Service Components, Apps, and Validation before Registering

System Architecture and the User Interface
In an article I wrote for The Northrop Grumman Technical Review Journal, entitled Service-oriented Architecture and User Interface Services: the Challenge of Building a User Interfaces in Services, I described five functional categories of user interfaces that a system architect might use to enable a user to employ  for an SOA-based Composite Application.  These included: Thin Client, Portal, Rich Client, Smart Client, and Rich/Smart Client.  I describe the characteristics sub-functions of each such that a system architect be able to determine which would serve the Composite Application's user best. 

In the article I linked the user interface categories to three categories of users (not my categories, but I could not track down the source), informational, transactional, and authoring.  An informational user is one who uses data and information in an ad hoc (through search and discovery methods) or regularly to retrieve information from one or more sources.  The data flow is primarily to the user.  Many commercial cable companies set up their networks for this type of user; with data rates twice as fast to the customer of the data and to the supplier of the data.  A transactional user is one who repetitiously inserts and/or retrieves the same type of data from an application.  For example, the office administrator in a doctor's office makes appointments, that is, he or she looks up on a calendar for dates and times that are open and then inserts an appointment.  For organizations, including businesses, the vast majority for the uses of data and user interfaces are of this type.  Finally, there is the "authoring" use.  This customer function is the most creative and would include: programming, document, video, and audio file creation and editing, engineering, verification and validation, and enumerable other content creation.  Creating a user interface for the authoring category is the most complex because this service links to the most complex functions of an application.

There were two reasons for writing this article.  First, for SOA-based Composite Applications, to demonstrate that the user interface could be built in Service Components, as there was a good deal of discussion between myself and my colleagues on this point.  Second, to demonstrate the patterns that a System Architect can use in the activity of decomposing the customer's system requirements and deriving the functional requirements, which is a key step in the system architecture process.

An Example
While a functional design for the user interface Service Component may seem like a semi-useful abstraction, Apple seems to have intuitively understood the concepts very well.  For those versed in SOA, an Apple "App" is simply a Service Component.  It performs a single function or a small group of closely coupled functions (in a system architecture sense), for the user.  Apple, and subsequently many other suppliers of wireless user interface devices, are now selling these User Interface Service Components.  Most of them are for the informational user, if you can call streaming a movie informational--the functional concept is the same.  Likewise stock quotes, news feeds, the weather radar real time image, the restaurants closest to the user (with customer critiques), and earth images of the user's current location (i.e. navigational maps) are all informational, that is, they are likely used on an as needed basis, or semi-regularly, to gain data and information about what is going on in the environment that affects them.

Even Apple's iTunes and Apps store are informational in that they link to discovery and download functions (services) on the server-side of the system.  There are Apps, like playing music, games, and currently, the calendar, that are standalone applications (functions), but even the camera function (service) is loosely couple with the e-mail user interface Service Component.  Consequently, the system architecture of the new mobile devices is, in fact, SOA-based, they just don't want to call it that.

As further proof, Apple is treating their Apps the manner a Service Component supplier should be treated.  Apple has significant verification process to ensure that Apple's policies and standards are met, before the App is offered to customers.   That is, Apple is verifying the Apps, the way all Service Component supplier should verify Service Components, especially, a user interface Service Component.  These include meeting security and dependability standards, as well as having a Service Component Description.  The Apps Store serves as the Service Component registry and discovery function in the SOA-based architecture.

Consequently, this is an excellent example of an SOA-based architecture (though it really doesn't use Web Services).

For more on SOA see SOA in a Rapid Implementation Environment, Enterprise SOA vs Ecosystem SOA, Private Cloud Computing vs Public Cloud Computing, Choreography vs Orchestration: Much Violent Agreement, and SOA Orchestration and Choreography Comparison.  For more on System Architecture see SOA in a Rapid Implementation Environment, Enterprise Architecture and System Architecture, and Lean or Agile Enterprises and Architecture.

Saturday, April 23, 2011

The Generalize Agile Development and Implementation Process for Software and Hardware

Background
In 2000, I created a Rapid Application Development (RAD) process, based on eXtreme Programming (XP) that was CMMI Level 3 conformat. Conformance means an outside audit was performed and the process conforms to the requirements of the CMMI level 3 key practices (note that CMMI levels 4 and 5 are organizational practices rather than process practices, so the Level 3 is as high as a process can get).

Advantages of the RAD Process
This RAD process, as I created it, has several advantages over traditional software development efforts, like "waterfall process".  The following advantages derive from XP.
  1. Works in monthly to 6 week cycles, enabling the customer to start using an Initial Operating Capability (IOC) version of the system, while the system in under development.  This meant that the customer was gaining some value even while the application was being implemented.  In the case of one small but unusual asset management, accounting, and accounts payable system, the customer, in the process of loading data into the IOC version found enough errors in the accounts to recover more than twice the cost of the effort to implement the application, that is, $100K+ errors during the implementation of a $50K system.
  2. Enables the customer to get their highest priority functions.  The RAD process does this by allowing the customer to add requirements during each development cycle and reprioritize the requirements between cycles.  This produces a much more satisfied customers, than "Big Bang" processes like "the waterfall" process.
  3. The development process is agile because it allows the customer to reprioritize their requirements.  In a book by Dr. Ralph Young on requirements, he cites a statistic that only 49% of the real customer requirements are known at the start of the development effort.  This RAD process allows the 51% to be incorporated, while keeping in budget using this repriortization function.  Since the product always meets the customer's highest priority requirements, they are much more satisfied with the result.
  4. Focuses the developer on developing, gathering than documenting--this is what the software developer is good at, while documenting isn't.  Consequently, the developer's morale improved (which meant their effectiveness and cost efficiency improved) so both the quantity and quality of the products improved.
  5. Minimizes the number of intermediate artifacts, that is, it eliminates the need to create documents like the Program Management Review (PMR) reports, status reports, design documents, Engineering Change Orders and so on.  This greatly reduces the need for developers and the program manager to create much of the documentation of other formal development processes.  In fact, as I created it, this RAD process eliminated the need for PMRs, because the customer was involved with the development team on a weekly basis.  And since the process assumed "that the program/project doesn't have all of the requirements at the start and enables the customer to add and reprioritize the requirements throughout the process, the resource requirements are kept level.  Therefore, from a programmatic perspective, this is a Level of Effort.  This means the same amount of money is spent each period; which reduces management of cost to nearly zero.  And since the implementation schedule is based on an unknown set of requirements, there is no way for a program manager to really create a schedule at the start of the effort and keep to it.  Instead, there is a monthly agreed set of requirements that must be fulfilled in development and rolled out--which by the way works, but which makes transaction managers and finance engineers paranoid--because they have so little CONTROL.  However, this process produced products of both a higher quality, and much greater quantity, and much more satisfied customers than the previous CMMI Level 3 processes.
  6. Like XP, I used Use Cases to gather requirements.  A Use Case is One way for one type of actor (either a person in a particular role, or another application) to use the application under development.  In my experience and in the experience of many of the 50+ systems engineers that I coached or mentored, or otherwise trained that Use Cases were the best way to gather requirements because they could be documented in ways the meant something to the customer (they can be documented to use the customer's own words); most other ways, like "shall statements" communicated much less because they are a transliteration of the customer's requirements.  Additionally, in general, they communicate as much, if not more to the developer.  Since the goal of requirements identification and management is to "communicate the customer's requirements to the developer and to ensure that these requirements are met", using the Use Cases, as recommended by XP proved both highly effective and cost efficient.
The net of all this is more satisfied customers, happier developers, and much more effective and cost efficient processes and products--in this case a real live "Win-Win" situation.  One consequence was that by 2005, literally, hundreds of small and medium (and even a few large) effort adopted this RAD process--and it proved highly successful within its domain (software development).

Limitations of Rapid Application Development (RAD) Processes
The key limitation of the RAD category of formal processes (processes that meet CMMI Level 3 practices) is that they are strictly for software development.  Formally, it is not possible to use this process for software or hardware integration, and for linkage to systems external to the organization, those activities that are most likely to occur in today's SOA and cloud-based environments.  Since most organizations purchase software and integrate it into systems rather than develop their own, a short cycle, agile implementation and transformation process is needed for such efforts.  This process should be the equivalent  for integration of the RAD process  that I designed and documented for software development.  In fact, it should have the same advantages as the RAD process, but applied to integration and tailoring of systems.
The Generalized Agile Development and  Implementation Process
Starting in about 2005, I gave thought to this Generalized Agile Implementation and Development (GAID) process would work.   This is a notional design and the challenges in designing such a process.  The notional design consists of four loops.
  1. The Requirements Identification and Validation Loop (Approximately 3 Months).  The purpose of this loop is to work with the customer to identify their requirements (the Systems Engineering Role), to decompose and derive the functions, to structure the functions, to allocate functions to components, to determine the acquisition method for components through trade off studies (make/buy/rent) (all in the System Architect role), and to validation that the product meets the customer's system requirements for this loop and all prior loops.  Additionally, each three month cycle allows for the acquisition and installation of any needed software, hardware, and networking components.
  2. The System Assembly/Implementation and Verification Loop (Approximately 1 Month).  The purpose of this loop is to assemble the various sub-assemblies (either those developed or those acquired from a supplier) and to verify that they meet their allocated functional and design constraint requirements.  Additionally, this loop enables the customer to see the overall progress of the product and suggest minor changes that will enhance the utility of the product for the customer. For example, this might include the placement of various data windows on a particular display.
  3. The Sub-system Design and/Assembly and Verification Loop (Approximately 1 Week).  The purpose of this loop is to ensure that components perform the functions specified in the component requirements to the level of dependability required and that the interfaces among components match for integration.  Additionally, this loop give the customer a first loop at the components, as they are being implemented, which means they can communicate changes they to like to see to the designers before the product start full up assembly and testing.  This greatly reduces the cost of the changes.
  4. The Component Construction and Verification Loop (Daily).  This is the loop where all of the detailed design, development, and COTS product configuration takes place.  While this loop might strike the reader as silly, all loops including this consist of engineering functions with a single program management meeting at the start/completion of a loop.  In this loop, it is a 15 minute long "stand up" meeting.  The reason for the meeting is to identify risks and issues, and to have the implementers set aside time to reduce the risk or close the issue before the next stand up meeting.
If this works like the RAD process I developed worked (and it should), after the initial period of learning the process, both the customer and the implementers will find it much more straightforward, simpler, and easy to use, while producing much more effective and cost efficient products.